The Trekker

The Hornet
The Trekker GA Drawing

Download GA Drawing (PDF)

HORNET SPECIFICATION SERIES 4190H-700HP WOOD WASTE MILL

G.V.M.
28 tonnes
WIDTH
2.9 metres
HEIGHT
3.6 metres
TRACKS
REDBACK SPEC TRACK FRAMES, BONFIGLIOLI/REXROTH DRIVES, KOMATSU/BERCO TRACK GEAR
ENGINE
CAT C-13 (435HP) 24v starting system, 35 AMP alternator, safety shutoffs for low oil pressure and high water temperature.
CLUTCH
HP TECH – HPTO 12 Clutch
MILL
Dynamically balanced, V-Belt driven, running 20 hammers with replaceable double ended bolt on tips.
HYDRAULICS
Rexroth variable displacement pump and electric solenoid valves driving radial piston motors.
OVERLOAD PROTECTION
Low hydraulic oil level and high hydraulic oil temperature. Blocked Hydraulic filter switches
INSTRUMENTATION
Tachometer, oil pressure, water temperature, fuel pressure and Amp meter.
CONTROL
Remote push button controller. Programmable PLC Infeed Control & Diagnostic System
INFEED
Slat conveyor 1.4 metres wide. Feedwheel opens to a height of 680mm.
OUTFEED
Extended Articulated Outfeed Conveyor 4.3m Discharge Height
OPTIONS
  • Mounted Fire Extinguishers
  • High Speed Track Drives

For more information: david@vangelder.com.au

CONSUMABLES-FREQUENCY/COST & RUNNING COST ESTIMATES

GREEN WASTE MILLS OPERATING COSTS MACHINE:   1190TR –415 HP (TREKKER)
ITEM DETAILS COST TYPICAL LIFE COST/HOUR
Hammer Tips Replace 20 @ $ 80.00 ea
40hrs
$40.00
Hammers Replace 20 @ $ 400.00 ea
2,000 hrs
$3.20
Screen Replace 1 set @ $ 3,500.00
500 hrs
$7.00
Liners Replace 1 set @ $ 2,200.00
1000 hrs
$2.20
O/F Conveyor Belt Replace 1 set @ $ 8,320.00
4,000 hrs
$2.08
I/F Head Shaft Replace 1 @ $ 2,500.00
4,000 hrs
$0.63
I/F Conveyor Slats Replace 1@ $ 9,000.00
3,000 hrs
$3.00
Anvil Replace $1,920.00
500 hrs
$3.84
HPTO Auto Clutch Service $100.00
250 hrs
$0.40
Cat Engine Service Service $500.00
150 hrs
$3.33
Cat Engine R & M   $30,000.00
8,000 hrs
$3.75
Hydraulic Motor Replace 1 @ $ 2,000.00
2,000 hrs
$1.00
Hoses Maintenance 1 @ $ 2,000.00
2,000 hrs
$1.00
Electrics Maintenance 1 @ $ 1,000.00
2,000 hrs
$0.50
Conveyor Pulleys   1@ $1,470.00
2,000 hrs
$0.74
General Maintenance Maintenance  
$20.00
Fuel 45 Litres p/h  
$45.00
TOTAL   $137.67

**Disclaimer: Actual Operating Costs will vary depending on Machine Maintenance, Operator Handling, Operating conditions, Machine usage and materials used.

Fuel & Replacement Parts are priced as at 1 July 2006 and are subject to change dependant on oil prices & spare parts market prices

This information is intended as a guide for comparison purposes within the Redback Machine Range only.